Heat Shrink Connectors, ANVINKU 210Pcs Heat Shrink Butt Connectors Kit, 10-26 AWG Heat Shrink Wire Connectors for Wiring, 4 Types Waterproof Heat Shrink Crimp Connectors with Box

Brand: ANVINKU Sold By: EveryMarket
$29.38 In Stock
Ships from UK, Arrives in 10-15 business days
Item can be returned in its original condition for a full refund or replacement within 30 days of receipt.
Delivery:
27
May2025
-
03
June2025
delivery Delivery Guarantee arrow
check$5 Credit If Delayed
checkFull Refund If Item Is Damaged
check15-Day Full Refund If No Updates
check30-Day Full Refund If Not Delivered
Heat Shrink Connectors, ANVINKU 210Pcs Heat Shrink Butt Connectors Kit, 10-26 AWG Heat Shrink Wire Connectors for Wiring, 4 Types Waterproof Heat Shrink Crimp Connectors with Box

Heat Shrink Connectors, ANVINKU 210Pcs Heat Shr...

$29.38

Product Details
  • 【Package Contents】: Contains 210 heat shrink butt connectors in a total of 4 colours, making it easy to identify which wire gauge is suitable. 20 pcs white heat shrink butt connectors (AWG 26 - 22), 90 pcs red heat shrink butt connectors (AWG 22 - 16), 90 pcs blue heat shrink butt connectors (AWG 16 - 14) and 10 pcs yellow heat shrink butt connectors (AWG 12 - 10).
  • 【Easy to Use】: Heat shrink connectors are very simple to use. Installation is accomplished by crimping the butt joints and then heating the plastic at each end. The heat shrink connectors are completely sealed against air, water and dirt.
  • 【Heat Shrink Wire Connectors Material】: Crimp connectors heat shrink have an outer layer of polyolefin tubing and an inner high quality tinned copper. Its double-walled design makes the outer layer highly resistant to moisture and insulation, while the inner layer maintains good electrical conductivity.
  • 【Clever Design】: The fusible inner adhesive layer of heat shrink crimp connectors provides a good seal for cables against moisture corrosion. The heat shrink wire connector is made of thick copper tubing, which is highly conductive, stable, and durable, so you don't have to worry about opening and slipping.
  • 【Applications】: Heat shrink butt connectors can be used in automobiles, ships, electrical equipment, aircraft, household appliances, electronic industry and other fields.

  • Color: red, blue, yellow, white
  • Manufacturer: ANVINKU
  • Model Number: Stoßverbinder
  • Part Number: 210PCS Stoßverbinder
  • Size: 210PCS

Heat Shrink Connectors, ANVINKU 210pcs Heat Shrink Butt Connectors Kit, 10-26 AWG Heat Shrink Wire Connectors for Wiring, 4 Types Waterproof Heat Shrink Crimp Connectors with Box

Specification

  • Pieces: 210 Pieces
  • 20 x White Connectors: Cable cross-section 0.3-0.5 mm² (A.W.G.:26-22);
  • 90 x Red Connectors: Cable cross-section 0.5-1.5 mm² (A.W.G.:22-16);
  • 90 x Blue Connectors: Cable cross-section 1.5-2.5 mm²(A.W.G.:16-14);
  • 10 x Yellow Connectors: Cable cross-section 4.0-6.0 mm²(A.W.G.:12-10).
  • Type: Heat Shrink Butt Connector
  • Material: Polyolefin

Easy to Use: Heat shrink connectors are very simple to use. Installation is accomplished by crimping the butt joints and then heating the plastic at each end. The heat shrink connectors are completely sealed against air, water and dirt.

Clever Design: The heat shrink crimp connectors's fusible inner adhesive layer provides a good seal for cables against moisture corrosion. The heat shrink wire connector is made of thick copper tubing, which is highly conductive, stable, and durable, so you don't have to worry about opening and slipping.

Applications: Heat shrink butt connectors can be used in automobiles, ships, electrical equipment, aircraft, household appliances, electronic industry and other fields.

Shipping Overview: 

Shipping: Standard Domestic Shipping within the United States charges USD 4.99. Standard International Shipping from United Kingdom, Germany and Japan to the United States charges 14.99. 

Order Processing: Please allow 1-2 business days for order processing and preparation before shipment. 

Domestic Shipping: Orders within the U.S. are shipped via USPS or FedEx, depending on the origin of the product. The average transit time is 3-7 business days. 

International Shipping: Currently, we only ship within the USA. 

Tracking Information: Every order is trackable. You will receive a tracking number once your order has been shipped. Products may be shipped from various global fulfillment centers.

Shipping Delays: 

Please note that shipping times may vary due to factors beyond our control, such as weather conditions, natural disasters, or peak holiday periods. While we strive to ensure timely delivery, the exact arrival time cannot be guaranteed and is managed by the shipping carrier.

Shipping Options:

  • Standard Delivery: Most orders are shipped within 3-7 business days. Larger items may utilize LTL shipping for safe handling.

  • Handling Time: We handle shipments on business days (Monday - Friday), with a preparation time of 1-2 days.

  • Additional Charges: Some items require additional shipping charges due to their size, weight, or special handling. These charges are specified on the product pages and are not eligible for shipping discounts.

  • Exclusions: Gift cards, packaging, taxes, and prior purchases do not count toward the minimum purchase requirement for free shipping. This offer is valid only for shipments to U.S. addresses, including Puerto Rico.

Delivery Details:

  • Estimates: Standard shipping within the US typically takes 3-7 business days. These are estimates and not guarantees.

  • Shipping Restrictions: We ship to all 50 states, Washington, DC, U.S. territories, and APO/FPO/DPO addresses. Shipping options vary based on the delivery address.

  • Remote Areas: Shipments to remote areas may incur additional charges or require pickup from a nearby shipping partner’s location.

Shipping Confirmation:

You will receive a shipping confirmation email with a tracking number as soon as your order is dispatched. If you do not receive this email immediately, please be assured that your items will arrive within the estimated delivery window provided at checkout.

Order Modifications:

If you need to cancel or modify your order, please contact our customer support immediately.

Issues with Delivery:

If your order shows as delivered but you have not received it, please contact the shipping carrier directly to resolve the issue. For persistent problems, contact our customer service at cs@everymarket.com.

Customer Support:

Our team is available 24/7 to assist you with any questions or concerns regarding your order. We are committed to ensuring a smooth shopping experience.

Return & Refund Policy Overview

Please review our return and refund policies below to ensure a smooth transaction process.

Return Policy

  • Duration: You have 30 days from receiving your item to initiate a return.

  • Condition: Items must be unworn, unwashed, with original tags and packaging intact.

  • Shipping Costs: Customers are responsible for return shipping costs.

  • Packaging: Ensure returned items are well-packaged to avoid damage during transit.

  • Tracking: Use a trackable and insured shipping method as we are not liable for items lost or damaged on return.

  • Initiating a Return: Contact us at cs@everymarket.com to start your return. We will provide a return shipping label and instructions upon approval. Returns without prior approval will not be accepted.

How to Return

  • Method: Returns must be sent back by mail to the address provided in the return instructions.

Return Label

  • Defective Products: Return labels are provided for defective items.

  • Non-Defective Returns: Customers are responsible for obtaining their return shipping label.

Product Conditions for Return

  • Eligible Products: Returns are only accepted for items in new condition.

Nonreturnable Items

Certain items are not eligible for return:

  • Electronic devices after 30 days (e.g., computers, laptops, Kindles)

  • Gift cards, prepaid game cards

  • Perishable goods, live insects, some jewelry, some health and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions

Refund Policy

  • Window: Eligible products may be returned within 30 days of delivery for a refund.

  • Refund Method: Refunds are processed to the original payment method or as store credit for items purchased with gift cards.

  • Processing Time: Refunds are processed within 3-5 business days after we receive the return; please allow additional time for shipping and bank processing.

Claims

Inspect your order upon arrival and report any defects, damages, or incorrect items immediately to allow us to address the issue. For claims, contact our support team with details of the issue.

Exchange Policy

For the quickest service, return your original item and place a new order for the desired product once your return is accepted.

Return Address

EveryMarket Customer Service 2101 E Terra Ln, O'Fallon, MO 63366

Customer Support

Available 24/7 for any questions or assistance needed:

  • Phone: +1 636-312-5925

  • Email: cs@everymarket.com

 

  • 【Package Contents】: Contains 210 heat shrink butt connectors in a total of 4 colours, making it easy to identify which wire gauge is suitable. 20 pcs white heat shrink butt connectors (AWG 26 - 22), 90 pcs red heat shrink butt connectors (AWG 22 - 16), 90 pcs blue heat shrink butt connectors (AWG 16 - 14) and 10 pcs yellow heat shrink butt connectors (AWG 12 - 10).
  • 【Easy to Use】: Heat shrink connectors are very simple to use. Installation is accomplished by crimping the butt joints and then heating the plastic at each end. The heat shrink connectors are completely sealed against air, water and dirt.
  • 【Heat Shrink Wire Connectors Material】: Crimp connectors heat shrink have an outer layer of polyolefin tubing and an inner high quality tinned copper. Its double-walled design makes the outer layer highly resistant to moisture and insulation, while the inner layer maintains good electrical conductivity.
  • 【Clever Design】: The fusible inner adhesive layer of heat shrink crimp connectors provides a good seal for cables against moisture corrosion. The heat shrink wire connector is made of thick copper tubing, which is highly conductive, stable, and durable, so you don't have to worry about opening and slipping.
  • 【Applications】: Heat shrink butt connectors can be used in automobiles, ships, electrical equipment, aircraft, household appliances, electronic industry and other fields.

  • Color: red, blue, yellow, white
  • Manufacturer: ANVINKU
  • Model Number: Stoßverbinder
  • Part Number: 210PCS Stoßverbinder
  • Size: 210PCS

Heat Shrink Connectors, ANVINKU 210pcs Heat Shrink Butt Connectors Kit, 10-26 AWG Heat Shrink Wire Connectors for Wiring, 4 Types Waterproof Heat Shrink Crimp Connectors with Box

Specification

  • Pieces: 210 Pieces
  • 20 x White Connectors: Cable cross-section 0.3-0.5 mm² (A.W.G.:26-22);
  • 90 x Red Connectors: Cable cross-section 0.5-1.5 mm² (A.W.G.:22-16);
  • 90 x Blue Connectors: Cable cross-section 1.5-2.5 mm²(A.W.G.:16-14);
  • 10 x Yellow Connectors: Cable cross-section 4.0-6.0 mm²(A.W.G.:12-10).
  • Type: Heat Shrink Butt Connector
  • Material: Polyolefin

Easy to Use: Heat shrink connectors are very simple to use. Installation is accomplished by crimping the butt joints and then heating the plastic at each end. The heat shrink connectors are completely sealed against air, water and dirt.

Clever Design: The heat shrink crimp connectors's fusible inner adhesive layer provides a good seal for cables against moisture corrosion. The heat shrink wire connector is made of thick copper tubing, which is highly conductive, stable, and durable, so you don't have to worry about opening and slipping.

Applications: Heat shrink butt connectors can be used in automobiles, ships, electrical equipment, aircraft, household appliances, electronic industry and other fields.

Shipping Overview: 

Shipping: Standard Domestic Shipping within the United States charges USD 4.99. Standard International Shipping from United Kingdom, Germany and Japan to the United States charges 14.99. 

Order Processing: Please allow 1-2 business days for order processing and preparation before shipment. 

Domestic Shipping: Orders within the U.S. are shipped via USPS or FedEx, depending on the origin of the product. The average transit time is 3-7 business days. 

International Shipping: Currently, we only ship within the USA. 

Tracking Information: Every order is trackable. You will receive a tracking number once your order has been shipped. Products may be shipped from various global fulfillment centers.

Shipping Delays: 

Please note that shipping times may vary due to factors beyond our control, such as weather conditions, natural disasters, or peak holiday periods. While we strive to ensure timely delivery, the exact arrival time cannot be guaranteed and is managed by the shipping carrier.

Shipping Options:

  • Standard Delivery: Most orders are shipped within 3-7 business days. Larger items may utilize LTL shipping for safe handling.

  • Handling Time: We handle shipments on business days (Monday - Friday), with a preparation time of 1-2 days.

  • Additional Charges: Some items require additional shipping charges due to their size, weight, or special handling. These charges are specified on the product pages and are not eligible for shipping discounts.

  • Exclusions: Gift cards, packaging, taxes, and prior purchases do not count toward the minimum purchase requirement for free shipping. This offer is valid only for shipments to U.S. addresses, including Puerto Rico.

Delivery Details:

  • Estimates: Standard shipping within the US typically takes 3-7 business days. These are estimates and not guarantees.

  • Shipping Restrictions: We ship to all 50 states, Washington, DC, U.S. territories, and APO/FPO/DPO addresses. Shipping options vary based on the delivery address.

  • Remote Areas: Shipments to remote areas may incur additional charges or require pickup from a nearby shipping partner’s location.

Shipping Confirmation:

You will receive a shipping confirmation email with a tracking number as soon as your order is dispatched. If you do not receive this email immediately, please be assured that your items will arrive within the estimated delivery window provided at checkout.

Order Modifications:

If you need to cancel or modify your order, please contact our customer support immediately.

Issues with Delivery:

If your order shows as delivered but you have not received it, please contact the shipping carrier directly to resolve the issue. For persistent problems, contact our customer service at cs@everymarket.com.

Customer Support:

Our team is available 24/7 to assist you with any questions or concerns regarding your order. We are committed to ensuring a smooth shopping experience.

Return & Refund Policy Overview

Please review our return and refund policies below to ensure a smooth transaction process.

Return Policy

  • Duration: You have 30 days from receiving your item to initiate a return.

  • Condition: Items must be unworn, unwashed, with original tags and packaging intact.

  • Shipping Costs: Customers are responsible for return shipping costs.

  • Packaging: Ensure returned items are well-packaged to avoid damage during transit.

  • Tracking: Use a trackable and insured shipping method as we are not liable for items lost or damaged on return.

  • Initiating a Return: Contact us at cs@everymarket.com to start your return. We will provide a return shipping label and instructions upon approval. Returns without prior approval will not be accepted.

How to Return

  • Method: Returns must be sent back by mail to the address provided in the return instructions.

Return Label

  • Defective Products: Return labels are provided for defective items.

  • Non-Defective Returns: Customers are responsible for obtaining their return shipping label.

Product Conditions for Return

  • Eligible Products: Returns are only accepted for items in new condition.

Nonreturnable Items

Certain items are not eligible for return:

  • Electronic devices after 30 days (e.g., computers, laptops, Kindles)

  • Gift cards, prepaid game cards

  • Perishable goods, live insects, some jewelry, some health and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions

Refund Policy

  • Window: Eligible products may be returned within 30 days of delivery for a refund.

  • Refund Method: Refunds are processed to the original payment method or as store credit for items purchased with gift cards.

  • Processing Time: Refunds are processed within 3-5 business days after we receive the return; please allow additional time for shipping and bank processing.

Claims

Inspect your order upon arrival and report any defects, damages, or incorrect items immediately to allow us to address the issue. For claims, contact our support team with details of the issue.

Exchange Policy

For the quickest service, return your original item and place a new order for the desired product once your return is accepted.

Return Address

EveryMarket Customer Service 2101 E Terra Ln, O'Fallon, MO 63366

Customer Support

Available 24/7 for any questions or assistance needed:

  • Phone: +1 636-312-5925

  • Email: cs@everymarket.com

 

Oops!

Sorry, it looks like some products are not available in selected quantity.

OK